Shipping Days |
|
---|
?* Information on days to ship and prices
THREE-M INDUSTRY
Starting from∗ : | 105.23 € |
---|---|
Min. Shipping Days : | 12 Days |
*Unit price with basic configuration
Brand |
---|
Product Series |
Starting from∗ |
Min. Shipping Days : |
Applicable Fluid |
Shape |
Body Material |
Supply Side, Connection Type |
Supply Side, Plumbing Thread Nominal |
Supply Side, Tube Flange Nominal |
Control Side, Connection Type |
Control Side, Plumbing Thread Nominal |
Control Side, Tube Flange Nominal |
Max. Operating Pressure(MPa) |
Brand | THREE-M INDUSTRY |
---|---|
Product Series | |
Starting from∗ | 105.23 € *Unit price with basic configuration |
Min. Shipping Days : | 12 Days |
Applicable Fluid | Gas |
Shape | Y Type |
Body Material | Stainless Steel |
Supply Side, Connection Type | Rc (R) |
Supply Side, Plumbing Thread Nominal | 1B ~ 3/8B |
Supply Side, Tube Flange Nominal | - |
Control Side, Connection Type | Rc (R) |
Control Side, Plumbing Thread Nominal | 1B ~ 3/8B |
Control Side, Tube Flange Nominal | - |
Max. Operating Pressure(MPa) | 2 |
Loading...