* Images are for illustrative purposes. The content and/or shape may differ depending on the selected model number.
Standard Unit Price: | 7.12 € Special price | 7.12 € |
---|---|---|
Shipping Days: | 9 Days |
Terminal block for connecting protective earth conductors to the mounting base (earth). Hardened steel withstands the mechanical forces, tin-coated copper ensures top conductivity.
This page is PE Terminal, part number 2551520000.
You can find the detail information about specifications and dimensions on part number 2551520000.
Part Number |
---|
2485870000 |
2490440000 |
2490590000 |
7904170000 |
7904280000 |
7907400000 |
Part Number | Related To | Standard Unit Price | Minimum order quantity | Volume Discount | Standard Shipping Days ? | Type of electrical connection 1 | Type of electrical connection 2 | Connection position | Number of levels | Number of clamp positions per level | Internally connected stages | Closing plate required | Colour | Explosion-tested version 'Ex e' | PEN function possible | Rated voltage (V) | Length (mm) | Operation temperature (°C) | Width/grid dimension (mm) | Height at lowest possible mounting height (mm) | Connectable conductor cross section solid-core (mm²) | Connectable conductor cross section fine-strand with cable end sleeve (mm²) | Connectable conductor cross section fine-strand without cable end sleeve (mm²) | Connectable conductor cross section multi-wired (mm²) | Rated current In (A) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
4.26 € | 50 | 9 Days | Plug-in connection | Plug-in connection | Above | 2 | 2 | - | true | Green/yellow | - | false | - | 45 | -60|130 | 3.5 | 84.5 | 0.5|1.5 | 0.5|1.5 | 0.5|1.5 | 0.5|1.5 | - | |||
3.97 € | 25 | 9 Days | Plug-in connection | - | Above | 1 | 2 | - | true | Green/yellow | - | - | - | 51.5 | -60|130 | 10 | 80.5 | 0.5|10 | 0.5|10 | 0.5|10 | 0.5|10 | - | |||
5.78 € | 25 | 9 Days | Plug-in connection | - | Above | 1 | 3 | - | true | Green/yellow | - | - | - | 51.5 | -60|130 | 10 | 102 | 0.5|10 | 0.5|10 | 0.5|10 | 0.5|10 | - | |||
3.54 € | 50 | 9 Days | Spring clamp connection | - | Above | 1 | 3 | - | true | Green/yellow | - | false | - | 43 | -50|120 | 6.1 | 85.5 | 0.5|6 | 0.5|4 | 0.5|6 | 0.5|6 | - | |||
4.49 € | 50 | 9 Days | Spring clamp connection | - | Above | 1 | 4 | - | true | Green/yellow | - | false | - | 43 | -50|120 | 6.1 | 104.5 | 0.5|6 | 0.5|4 | 0.5|6 | 0.5|6 | - | |||
5.32 € | 50 | 9 Days | Spring clamp connection | - | Above | 1 | 3 | - | true | Green/yellow | - | false | - | 45 | -50|120 | 8.1 | 90 | 0.5|10 | 0.5|6 | 0.5|10 | 1.5|10 | - |