Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | Overall Length (m) | Conductor Cross Section (mm2) | Number Of Cores (Core) | Finished outer diameter (mm) | |
---|---|---|---|---|---|---|---|---|
662.68 € | 1 | 5 Days | 41 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
678.86 € | 1 | 5 Days | 42 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
695.02 € | 1 | 5 Days | 43 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
711.17 € | 1 | 5 Days | 44 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
727.35 € | 1 | 5 Days | 45 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
743.51 € | 1 | 5 Days | 46 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
759.66 € | 1 | 5 Days | 47 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
775.82 € | 1 | 5 Days | 48 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
792.00 € | 1 | 5 Days | 49 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
808.15 € | 1 | 5 Days | 50 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
824.31 € | 1 | 5 Days | 51 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
840.49 € | 1 | 5 Days | 52 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
856.65 € | 1 | 5 Days | 53 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
872.80 € | 1 | 5 Days | 54 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
888.98 € | 1 | 5 Days | 55 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
905.14 € | 1 | 5 Days | 56 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
921.29 € | 1 | 5 Days | 57 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
937.45 € | 1 | 5 Days | 58 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
953.63 € | 1 | 5 Days | 59 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
969.78 € | 1 | 5 Days | 60 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
985.94 € | 1 | 5 Days | 61 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,002.12 € | 1 | 5 Days | 62 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,018.28 € | 1 | 5 Days | 63 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,034.43 € | 1 | 5 Days | 64 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,050.62 € | 1 | 5 Days | 65 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,066.77 € | 1 | 5 Days | 66 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,082.92 € | 1 | 5 Days | 67 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,099.08 € | 1 | 5 Days | 68 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,115.26 € | 1 | 5 Days | 69 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,131.42 € | 1 | 5 Days | 70 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,147.57 € | 1 | 5 Days | 71 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,163.75 € | 1 | 5 Days | 72 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,179.91 € | 1 | 5 Days | 73 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,196.06 € | 1 | 5 Days | 74 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,212.25 € | 1 | 5 Days | 75 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,228.40 € | 1 | 5 Days | 76 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,244.55 € | 1 | 5 Days | 77 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,260.71 € | 1 | 5 Days | 78 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,276.89 € | 1 | 5 Days | 79 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,293.05 € | 1 | 5 Days | 80 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,309.20 € | 1 | 5 Days | 81 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,325.38 € | 1 | 5 Days | 82 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,341.54 € | 1 | 5 Days | 83 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,357.69 € | 1 | 5 Days | 84 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,373.88 € | 1 | 5 Days | 85 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,390.03 € | 1 | 5 Days | 86 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,406.18 € | 1 | 5 Days | 87 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,422.34 € | 1 | 5 Days | 88 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,438.52 € | 1 | 5 Days | 89 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,454.68 € | 1 | 5 Days | 90 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,470.83 € | 1 | 5 Days | 91 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,487.02 € | 1 | 5 Days | 92 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,503.17 € | 1 | 5 Days | 93 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,519.32 € | 1 | 5 Days | 94 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,535.51 € | 1 | 5 Days | 95 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,551.66 € | 1 | 5 Days | 96 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,567.82 € | 1 | 5 Days | 97 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,583.97 € | 1 | 5 Days | 98 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,600.15 € | 1 | 5 Days | 99 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 | ||
1,616.31 € | 1 | 5 Days | 100 | 0.5 + 0.25 | 4 + 3 × (2 + 2) | 9.5 |
Loading...
Rated Voltage | 50V | Shield | Tin plated copper braid | Properties | Oil Resistance |
---|---|---|---|---|---|
Representative Standard | UL / CE | Sheath (outer coating) color | Green | Grounding Wire | N/A |
Sheath (outer coating) material | Urethane-Based | Insulation body materials | TPE admixture |
Configure
Basic Attributes
Overall Length(m)
Conductor Cross Section(mm2)
Number Of Cores(Core)
Finished outer diameter(mm)
Filter by standard shipping days
Optional Attributes