Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
Type | Material | Surface Treatment (Lining) | Hardness | ||
Core | Bearing | One Way Clutch | |||
ROROWA | Aluminum Alloy | Steel | EN 1.0330 Equiv. | Clear Anodize | - |
ROROWAU | Urethane (Natural Color) |
Shore A90 | |||
ROROWAG | Shore A70 | ||||
ROROWAH | Shore A50 |
Part Number | - | T | - | d | - | L |
ROROWA30 ROROWAU40 |
- |
T5 |
- - |
12 20 |
- - |
L300 L250 |
Part Number | Urethane Thickness T Selection |
d | L | One Way Clutch Allowable Torque (Nm) | Bearing Used | D1 | D2 | B1 | B | d1 | ||
Type | D | 10mm Increment | Shaft: h5 Tolerance | Shaft: h6 Tolerance | ||||||||
Core Only ROROWA Urethane Baked ROROWAU ROROWAG ROROWAH |
20 | 3 5 |
8 | 50~100 | 3.2 | 1.6 | B688ZZ | 12 | 16 | 5 | 12 | 10 |
30 | 12 | 50~300 | 12.2 | 6.1 | B6901ZZ | 18 | 24 | 6 | 16 | 15 | ||
40 | 20 | 28.5 | 14.3 | B6804ZZ | 26 | 32 | 7 | 16 | 22 | |||
50 | 20 | B6904ZZ | 26 | 37 | 9 | 16 | 22 | |||||
25 | 66 | 33 | B6905ZZ | 32 | 42 | 9 | 20 | 27 |
3D preview is not available, because the part number has not yet been determined.
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | RoHS | Roller Type | Urethane Rubber Processing | Metal part outer diameter D (mm) | Length (mm) | I.D. d (mm) | Urethane/Rubber Hardness | Urethane/Rubber Material | Urethane/Rubber Color | Urethane Thickness T | L | L (mm) | L Dimension Change (Configurable in 1mm Increment) [LC] | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
- | 1 | 9 Days | 10 | Metal Rollers | - | 20 | Up to 50 / Up to 100 | 8 | - | - | - | - | 50 ~ 100 | - | - | ||
- | 1 | 9 Days | 10 | Metal Rollers | - | 20 | Up to 50 / Up to 100 | 8 | - | - | - | - | - | - | 51 ~ 99 | ||
- | 1 | 9 Days | 10 | Metal Rollers | - | 30 | Up to 50 / Up to 100 / Up to 300 | 12 | - | - | - | - | 50 ~ 300 | - | - | ||
- | 1 | 9 Days | 10 | Metal Rollers | - | 30 | Up to 50 / Up to 100 / Up to 300 | 12 | - | - | - | - | - | - | 51 ~ 299 | ||
- | 1 | 9 Days | 10 | Metal Rollers | - | 40 | Up to 50 / Up to 100 / Up to 300 | 20 | - | - | - | - | 50 ~ 300 | - | - | ||
- | 1 | 9 Days | 10 | Metal Rollers | - | 40 | Up to 50 / Up to 100 / Up to 300 | 20 | - | - | - | - | - | - | 51 ~ 299 | ||
- | 1 | 9 Days | 10 | Metal Rollers | - | 50 | Up to 50 / Up to 100 / Up to 300 | 20 | - | - | - | - | 50 ~ 300 | - | - | ||
- | 1 | 9 Days | 10 | Metal Rollers | - | 50 | Up to 50 / Up to 100 / Up to 300 | 20 | - | - | - | - | - | - | 51 ~ 299 | ||
- | 1 | 9 Days | 10 | Metal Rollers | - | 50 | Up to 50 / Up to 100 / Up to 300 | 25 | - | - | - | - | 50 ~ 300 | - | - | ||
- | 1 | 9 Days | 10 | Metal Rollers | - | 50 | Up to 50 / Up to 100 / Up to 300 | 25 | - | - | - | - | - | - | 51 ~ 299 | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 20 | Up to 50 / Up to 100 | 8 | 70 | Urethane | Natural Color | 3 | - | 50 ~ 100 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 20 | Up to 50 / Up to 100 | 8 | 70 | Urethane | Natural Color | 3 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 20 | Up to 50 / Up to 100 | 8 | 70 | Urethane | Natural Color | 5 | - | 50 ~ 100 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 20 | Up to 50 / Up to 100 | 8 | 70 | Urethane | Natural Color | 5 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 30 | Up to 50 / Up to 100 / Up to 300 | 12 | 70 | Urethane | Natural Color | 3 | - | 50 ~ 300 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 30 | Up to 50 / Up to 100 / Up to 300 | 12 | 70 | Urethane | Natural Color | 3 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 30 | Up to 50 / Up to 100 / Up to 300 | 12 | 70 | Urethane | Natural Color | 5 | - | 50 ~ 300 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 30 | Up to 50 / Up to 100 / Up to 300 | 12 | 70 | Urethane | Natural Color | 5 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 40 | Up to 50 / Up to 100 / Up to 300 | 20 | 70 | Urethane | Natural Color | 3 | - | 50 ~ 300 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 40 | Up to 50 / Up to 100 / Up to 300 | 20 | 70 | Urethane | Natural Color | 3 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 40 | Up to 50 / Up to 100 / Up to 300 | 20 | 70 | Urethane | Natural Color | 5 | - | 50 ~ 300 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 40 | Up to 50 / Up to 100 / Up to 300 | 20 | 70 | Urethane | Natural Color | 5 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 50 | Up to 50 / Up to 100 / Up to 300 | 20 | 70 | Urethane | Natural Color | 3 | - | 50 ~ 300 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 50 | Up to 50 / Up to 100 / Up to 300 | 20 | 70 | Urethane | Natural Color | 3 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 50 | Up to 50 / Up to 100 / Up to 300 | 25 | 70 | Urethane | Natural Color | 3 | - | 50 ~ 300 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 50 | Up to 50 / Up to 100 / Up to 300 | 25 | 70 | Urethane | Natural Color | 3 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 50 | Up to 50 / Up to 100 / Up to 300 | 20 | 70 | Urethane | Natural Color | 5 | - | 50 ~ 300 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 50 | Up to 50 / Up to 100 / Up to 300 | 20 | 70 | Urethane | Natural Color | 5 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 50 | Up to 50 / Up to 100 / Up to 300 | 25 | 70 | Urethane | Natural Color | 5 | - | 50 ~ 300 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 50 | Up to 50 / Up to 100 / Up to 300 | 25 | 70 | Urethane | Natural Color | 5 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 20 | Up to 50 / Up to 100 | 8 | 50 | Urethane | Natural Color | 3 | - | 50 ~ 100 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 20 | Up to 50 / Up to 100 | 8 | 50 | Urethane | Natural Color | 3 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 20 | Up to 50 / Up to 100 | 8 | 50 | Urethane | Natural Color | 5 | - | 50 ~ 100 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 20 | Up to 50 / Up to 100 | 8 | 50 | Urethane | Natural Color | 5 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 30 | Up to 50 / Up to 100 / Up to 300 | 12 | 50 | Urethane | Natural Color | 3 | - | 50 ~ 300 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 30 | Up to 50 / Up to 100 / Up to 300 | 12 | 50 | Urethane | Natural Color | 3 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 30 | Up to 50 / Up to 100 / Up to 300 | 12 | 50 | Urethane | Natural Color | 5 | - | 50 ~ 300 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 30 | Up to 50 / Up to 100 / Up to 300 | 12 | 50 | Urethane | Natural Color | 5 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 40 | Up to 50 / Up to 100 / Up to 300 | 20 | 50 | Urethane | Natural Color | 3 | - | 50 ~ 300 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 40 | Up to 50 / Up to 100 / Up to 300 | 20 | 50 | Urethane | Natural Color | 3 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 40 | Up to 50 / Up to 100 / Up to 300 | 20 | 50 | Urethane | Natural Color | 5 | - | 50 ~ 300 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 40 | Up to 50 / Up to 100 / Up to 300 | 20 | 50 | Urethane | Natural Color | 5 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 50 | Up to 50 / Up to 100 / Up to 300 | 20 | 50 | Urethane | Natural Color | 3 | - | 50 ~ 300 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 50 | Up to 50 / Up to 100 / Up to 300 | 20 | 50 | Urethane | Natural Color | 3 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 50 | Up to 50 / Up to 100 / Up to 300 | 25 | 50 | Urethane | Natural Color | 3 | - | 50 ~ 300 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 50 | Up to 50 / Up to 100 / Up to 300 | 25 | 50 | Urethane | Natural Color | 3 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 50 | Up to 50 / Up to 100 / Up to 300 | 20 | 50 | Urethane | Natural Color | 5 | - | 50 ~ 300 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 50 | Up to 50 / Up to 100 / Up to 300 | 20 | 50 | Urethane | Natural Color | 5 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 50 | Up to 50 / Up to 100 / Up to 300 | 25 | 50 | Urethane | Natural Color | 5 | - | 50 ~ 300 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 50 | Up to 50 / Up to 100 / Up to 300 | 25 | 50 | Urethane | Natural Color | 5 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 20 | Up to 50 / Up to 100 | 8 | 90 | Urethane | Natural Color | 3 | - | 50 ~ 100 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 20 | Up to 50 / Up to 100 | 8 | 90 | Urethane | Natural Color | 3 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 20 | Up to 50 / Up to 100 | 8 | 90 | Urethane | Natural Color | 5 | - | 50 ~ 100 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 20 | Up to 50 / Up to 100 | 8 | 90 | Urethane | Natural Color | 5 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 30 | Up to 50 / Up to 100 / Up to 300 | 12 | 90 | Urethane | Natural Color | 3 | - | 50 ~ 300 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 30 | Up to 50 / Up to 100 / Up to 300 | 12 | 90 | Urethane | Natural Color | 3 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 30 | Up to 50 / Up to 100 / Up to 300 | 12 | 90 | Urethane | Natural Color | 5 | - | 50 ~ 300 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 30 | Up to 50 / Up to 100 / Up to 300 | 12 | 90 | Urethane | Natural Color | 5 | - | - | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 40 | Up to 50 / Up to 100 / Up to 300 | 20 | 90 | Urethane | Natural Color | 3 | - | 50 ~ 300 | - | ||
- | 1 | 12 Days | 10 | Urethane / Rubber Rollers | Lining | 40 | Up to 50 / Up to 100 / Up to 300 | 20 | 90 | Urethane | Natural Color | 3 | - | - | - |
Loading...
Mounting Method | With One Way Clutch | Roller Shape | Straight | Surface Treatment | Clear Anodized Aluminum |
---|---|---|---|---|---|
Bearing Material | Steel |
Configure
Basic Attributes
Roller Type
Urethane Rubber Processing
Metal part outer diameter D(mm)
I.D. d(mm)
Urethane/Rubber Hardness
Urethane/Rubber Material
Urethane/Rubber Color
Urethane Thickness T
L
L(mm)
L Dimension Change (Configurable in 1mm Increment) [LC]
Type
Length(mm)
Filter by CAD data type
Optional Attributes